m[i].l=1*new Date(); for (var j = 0; j < document.scripts.length; j++) {if (document.scripts[j].src === r) { return; }} k=e.createElement(t),a=e.getElementsByTagName(t)[0],k.async=1,k.src=r,a.parentNode.insertBefore(k,a)}) (window, document, "script", "https://mc.yandex.ru/metrika/tag.js", "ym"); ym(95911708, "init", { clickmap:true, trackLinks:true, accurateTrackBounce:true });
ruseng

Council structures

Working groups and other structures:

  • Commission on operational and technological coordination of the joint work of the CIS and Baltic Energy Systems
  • Commission on coordination of cooperation of state bodies of energy supervision of the CIS member states  
  • Working group "Formation of the general electricity market of the CIS member states"
  • Working group on digital transformation of electric power industry
  • Working group on professional education and training
  • Working group on low -carbon development of electric power industry
  • Working group on technological issues of reliability and safe operation of equipment