By the end of 2022, 7 new stations with a total capacity of 1474 MW will be put into operation in Uzbekistan - 6 thermal power plants (TPPs) and one solar photoelectric power plant
02 апреля 2022
Views:
384
By the end of 2022, 7 new power plants with a total capacity of 1,474 MW will be put into operation in Uzbekistan - 6 thermal power plants (TPPs) and one solar photoelectric power plant (PVP).
As a result, the total capacity of the power system of Uzbekistan will exceed 16,000 MW.